A successful partnership between Generation UK Edinburgh and City Access Scaffolding led to an innovative rolling, rather than fixed platform, to complete a school atrium in the City Centre.

Project

Project

The solution provided safe access and working platform for roof contractors without compromise for the other trades on site. The solution not only improved site efficiency it reduced erection time and scaffold required by 86% and 90% respectively over the other solutions proposed. 

City Access Scaffolding were commissioned to erect a safe system of work for skylight and roof installation teams, for a new build school atrium area in Edinburgh City Centre. The system required needed to support numerous personnel and trades operating onsite with their own set of access and equipment requirements.

The initial plan was to build a freestanding system scaffold, using Genlok, from the ground up, over a footprint of 25m in length, 15m in width and a height of 20m. The proposed structure required a team of six operatives working from the ground up, supported by materials being dropped into the working area by the tower crane.

The design meant the scaffold covered all the loading bays to the other floors, which limited the use of site based tower cranes to supply the other trades. To support this approach required scaffolding teams onsite with an intensive build and dismantle programme to ensure supply and access for the other trades working across the site.

With the size of footprint the design required around 100 tonnes of materials and the entire installation programme was estimated at 4 weeks.

 Mark Skinner, Director of City Access and Craig Watson, Branch Manager of Generation Edinburgh had a site meeting to discuss design and scaffold solutions. At this point Craig Watson suggested the possibility of a temporary rolling structure as opposed to a fixed platform using Generation’s Uni Roof Runway Track System.

The concept was to build two independent scaffolds at two elevations, each scaffold to be fitted with our Uni Roof Runway Track System so mobile castor wheels could be connected to enable us to move the scaffold depending on the day to day site requirements.  The initial concept was to erect two separate mobile structures on this scaffold allowing for multiple trade use. 

The initial concept was drawn up and agreed between Craig Watson and Mark Skinner and issued to Generation Design Engineers for clarity and suitability of concept. They were then provided to Zenith design to issue construction drawings for the main contractor to accept.

By utilising this safe system of work, City Access Scaffolding reduced the erection time by 86%, from four weeks to three days, and equipment required by 90% from 100 tonnes to 10 tonnes of materials. 

This does not account for time savings onsite where the design ensured that trades working below could still take advantage of the tower crane whilst allowing the roofing contractors safe access and a working platform.

Discuss your project

If you are looking for design support and to talk through your project, speak to our experts. What we can provide you:

  • Custom technical drawings based on your site

  • Expert team with extensive experience

  • High-quality products

Contact our specialists

Area Covered: Birmingham North

Area Covered: Birmingham West

Area Covered: Bournemouth

Dominic Sheppard

01202 591255

[email protected]

Area Covered: Brigg

Area Covered: Bristol East

Area Covered: Cardiff

Area Covered: Cardiff Docks

Area Covered: Chelmsford

Area Covered: Chichester

Area Covered: Croydon

Area Covered: Dundee

Area Covered: Edinburgh East

Laurence McTernan

0131 552 7534

[email protected]

Area Covered: Edinburgh West

Area Covered: Glasgow East

Area Covered: Glasgow South

Area Covered: Grays

Area Covered: Kings Lynn

Area Covered: Leeds South East

Area Covered: Light Access-Chelmsford

Area Covered: London East / South Ockendon

Area Covered: London West

Area Covered: Luton

Area Covered: Manchester

Area Covered: Newcastle

Kevin Philliskirk

0191 492 1190

[email protected]

Area Covered: Northampton

Area Covered: Norwich

Area Covered: Nottingham

Area Covered: Peterborough

Area Covered: Reading

Area Covered: Rotherham

Area Covered: Truro

Area Covered: Widnes

Edinburgh West

For more information, contact this branch

Our use of cookies

Some cookies are necessary for us to manage how our website behaves while other optional, or non-necessary, cookies help us to analyse website usage. You can Accept All or Reject All optional cookies or control individual cookie types below.

You can read more in our Cookie Notice

Functional

These cookies enable core functionality such as security, network management, and accessibility. You may disable these by changing your browser settings, but this may affect how the website functions.

Analytics cookies

Analytical cookies help us to improve our website by collecting and reporting information on its usage.

Third-Party Cookies

These cookies are set by a website other than the website you are visiting usually as a result of some embedded content such as a video, a social media share or a like button or a contact map

Site Choice
Please select preferred site