A bit about Futuro
Altrad Generation has partnered with Altrad Plettac to specify and manufacture the Futuro Ring System. The partnership combines to create Generation value for money with German engineering to deliver the best ring system on the market. The Altrad group have been manufacturing the Futuro ring system for over 20 years. This hot-dipped galvanised system meets European Standards EN12810 and EN12811-1. Audited by the NASC, Futuro meets or exceeds the criteria to satisfy the code of practice for proprietary System Scaffolds within the UK.
Futuro is the ideal choice for domestic/commercial/industrial and civil applications. Due to the eight available connection points per optimised disc, the flexibility of this system with its in-built loading class capability and high point loading capacities makes Futuro capable of dealing with all aspects of the construction and infrastructure markets.
Utilising the galvanised steel perforated decks, along with drop forged claws and integrated deck retainers, the Futuro Ring System offers a range of up to eight bay lengths, enabling maximum accuracy on virtually any project. Along with a possible saving of up to 40% on erection time against traditional tube and fitting and a significant reduction in the manual handling of quantities and weights, the tubular support system benefits from using various components for multiple tasks giving a further reduction in components required on site.
Please Note ~ Futuro Ring System (Tubular Support) is available for hire & sale within the UK. Futuro U-System (U Support) is available on a sale-only basis. Please contact your nearest Altrad Generation Hire & Sale branch for further information and availability.