The Maxi Drag Box is ideal for use with long pipe runs, the size increases productivity allowing for a faster installation time. The Maxi Drag Box can be installed using the ‘Excavate and Drag’ technique. The box is placed in a pre-dug trench and pulled along the trench as each section of pipe laying is completed.